Project Scheduler
Duluth, MN, US, 55802
Lake Superior Consulting is seeking an experienced Scheduler to join our team!
We are seeking an experienced P6 Scheduler to support complex engineering and construction projects. This role is responsible for developing, maintaining, and analyzing Critical Path Method schedules using Primavera P6 and related tools.
The level will be determined based on experience, leadership capability, and technical depth. This is an excellent opportunity for a mid-level scheduler ready to grow, or a senior scheduling professional looking to lead and influence project performance at a strategic level.
Our projects support large-scale engineering, procurement, maintenance, pipeline, and construction initiatives from project inception through successful delivery.
What You Will Do
Core Responsibilities for Both Levels
- Develop, maintain, and update CPM schedules using Primavera P6
- Build resource-loaded and cost-loaded schedules
- Develop Work Breakdown Structures and activity coding
- Track progress, milestones, and percent complete performance
- Perform schedule updates and communicate status to project teams
- Support resource forecasting and leveling efforts
- Facilitate schedule meetings with project teams and stakeholders
- Prepare schedule reports including histograms, curves, and executive summaries
Additional Responsibilities for Scheduler III
- Serve as the subject matter expert for Critical Path Methodology
- Lead development and oversight of complex and integrated master schedules
- Establish and maintain schedule baselines and perform advanced analysis
- Lead forecasting efforts including Estimate To Complete and Estimate At Complete
- Conduct detailed schedule risk assessments and recovery planning
- Present schedule insights, risks, and mitigation strategies to leadership and clients
- Mentor and develop other schedulers
- Support earned value management and perform DCMA 14-point schedule assessments
What You Bring
Scheduler II
- 3 to 6 years of scheduling experience in engineering or construction environments
- Experience using Primavera P6 PPM or EPPM
- Working knowledge of CPM principles
- Experience with Microsoft Project and Excel reporting
- Strong organizational and communication skills
- Bachelor’s degree preferred; HS Diploma required
Scheduler III
- Bachelor’s degree in construction management, engineering, business, or related field and 3 or more years of advanced schedule management experience
OR equivalent combination of education and experience - Demonstrated experience leading schedule development for complex projects
- Advanced Primavera P6 expertise including resource and cost loading
- Experience with earned value management and schedule forecasting
- Strong analytical and problem-solving capability
- Ability to work independently and influence project stakeholders
Preferred Qualifications
- Engineering, Procurement, Construction project experience
- PSP, PMP, PMI-SP, or related certification or willingness to pursue
- Experience with Primavera Unifier
- Familiarity with Tableau or Power BI
- Building Information Modeling experience
- Knowledge of DCMA 14-point assessment standards
Work Environment and Travel
- Office-based with field and client site exposure
- Travel up to 25%
- Ability to work extended hours when project demands require
Why Join Us
- Opportunity to work on high-impact infrastructure and construction projects
- Clear growth path
- Exposure to large-scale, technically complex programs
- Collaborative environment with strong project leadership
Be Part of Something Bigger – Join the Team at Lake Superior Consulting!
At LSC, you’ll have the opportunity to collaborate with top-tier talent and take on meaningful projects in industries including Liquids and Natural Gas, Power, Mining, Water and Wastewater, Renewables, and Manufacturing.
If you’re driven, curious, and ready to grow your career while making a difference, we want to hear from you.
Lake Superior Consulting offers a competitive compensation package. The actual starting salary will be determined based on a variety of factors, including your skills, experience, and office/market location. The anticipated salary/hourly range for this position is $70,000-$133,500 per year.
Our benefits include:
• Medical, Dental, Vision Insurance
• Flexible work options
• 401K/Profit Sharing (6% company match)
• Company paid life, AD&D, and short/long term disability
• Paid time off (PTO)
• Paid holidays (twelve per year)
• Tuition reimbursement
Bias-Free Hiring Practices:
Lake Superior Consulting is proud to be an Equal Employment employer. We celebrate diversity and do not discriminate based on race, religion, color, national origin, sex, sexual orientation, age, veteran status, disability status, or any other applicable characteristics protected by law.
Nearest Major Market: Duluth MN
Nearest Secondary Market: Superior WI